Backed by Illinois energy legislation

Counties / Peoria County / Peoria

Battery Storage Leases Near Peoria, IL

Peoria County has the densest substation network in the target area with 39 substations. The Powerton-Nevada 345 kV corridor alone has 750 MW of battery projects queued. Lower farm rents make the lease income differential especially significant.

Estimated Annual Lease

$40,000

5 MW project (~0.5 acres)

Nearby Substations

39

Up to 750 MW capacity

County

Peoria

Peoria County, IL

Grid infrastructure near Peoria

The Peoria area has 39 ComEd substations with up to 750 MW of capacity for battery storage interconnection. Key connection points include:

PowertonEdwardsNebraskaKice

Properties within 2-5 miles of these substations are the most viable for battery storage leases. Our team evaluates proximity, feeder infrastructure, and available capacity for each property at no cost.

What Peoria-area landowners can earn

Battery storage developers pay per megawatt of installed capacity. Here's what landowners near Peoria could earn:

Project SizeAnnual LeaseLand Needed25-Year Total
2 MW$16,000/yr~0.2 acres$500,000
5 MW$40,000/yr~0.5 acres$1,250,000
10 MW$80,000/yr~1 acres$2,500,000
20 MW$160,000/yr~2 acres$5,000,000

How to get started near Peoria

1

Tell us about your property

Fill out a short form with your property location near Peoria. Takes about two minutes.

2

We check your site

We evaluate your property's proximity to Peoria-area substations, available interconnection capacity, and grid infrastructure.

3

Review a lease offer

If your property qualifies, we present lease terms with annual payment amounts, duration, and escalation schedule.

4

Start earning

Once signed, the developer handles permitting and construction. You start receiving lease payments.

Questions from Peoria-area landowners

Can I lease my land for battery storage near Peoria?

If your property is within a few miles of a ComEd substation with available interconnection capacity in the Peoria area, it may qualify. Peoria County has 39 substations with up to 750 MW of capacity. Submit a free assessment to find out.

How much land do I need near Peoria?

Battery storage needs only 0.2-2 acres — far less than solar. A typical 5 MW project uses about 0.5 acres. The rest of your property stays in production.

Will this affect my farming?

No. The installation is a small fenced area — typically the size of a few shipping containers on a concrete pad. Farmers report no impact on planting, harvesting, drainage, or equipment access.

Is there any cost to me?

None. The developer covers everything — permitting, construction, equipment, maintenance, and insurance. The assessment is also free with no obligation.

Own land near Peoria?

Find out if your property qualifies for a battery storage lease. Free assessment, no obligation.