Battery Storage Leases in Grundy County

Grundy County sits at a critical grid junction where major 345 kV transmission lines converge near the Dresden nuclear station. With 740 MW of battery projects in the queue, it's one of the most active areas for energy storage development in Illinois.

Estimated Annual Lease

$40,000

5 MW project (~0.5 acres)

Substations

5

With available capacity

vs Farm Rent

276x

$290/acre avg farm rent

Earnings by project size

Battery storage developers pay per megawatt of installed capacity. Here's what Grundy County landowners could earn:

Project SizeAnnual LeaseLand Neededvs Farm Rent
2 MW$16,000/yr~0.2 acres276x more
5 MW$40,000/yr~0.5 acres276x more
10 MW$80,000/yr~1 acres276x more
20 MW$160,000/yr~2 acres276x more

Grid infrastructure in Grundy County

Grundy County has 5 ComEd substations that may have available capacity for battery storage interconnection. Key substations include:

DresdenCollinsWilmington

Not every property near a substation will qualify. Available capacity, queue depth, and feeder configuration determine viability. Our team evaluates each site individually at no cost.

Common questions from Grundy County landowners

How much can I earn from a battery storage lease in Grundy County?

Based on current industry rates, Grundy County landowners can earn $40,000 to $80,000 per year from a 5-10 MW battery storage project. This uses only 0.5 to 1 acre of land. Current average farm cash rent in Grundy County is $290/acre/year (USDA NASS 2024).

Does my land in Grundy County qualify?

Grundy County is in the ComEd service territory with 5 substations. Whether your specific property qualifies depends on proximity to a substation with available interconnection capacity. Submit a free assessment at illinoisbattery.com/apply to find out.

How much land do I need?

A typical battery storage project needs 0.2 to 2 acres — far less than solar. A 5 MW project uses about 0.5 acres. The rest of your property stays in production.

Is there any cost to me?

No. The developer covers all costs — permitting, construction, equipment, maintenance, and insurance. There is no cost to the landowner at any point.

Towns in Grundy County

Explore battery storage opportunities near specific towns in Grundy County:

Own land in Grundy County?