Backed by Illinois energy legislationBattery energy storage is supported by Illinois state energy legislation
Counties / Grundy County / Minooka
Minooka on the northern edge of Grundy County benefits from proximity to the Dresden-Collins 345 kV transmission hub. The area's 740 MW of queued battery projects and rapid suburban growth make agricultural parcels here especially valuable for energy storage.
Estimated Annual Lease
$40,000
5 MW project (~0.5 acres)
Nearby Substations
5
Up to 740 MW capacity
County
Grundy
Grundy County, IL
The Minooka area has 5 ComEd substations with up to 740 MW of capacity for battery storage interconnection. Key connection points include:
Properties within 2-5 miles of these substations are the most viable for battery storage leases. Our team evaluates proximity, feeder infrastructure, and available capacity for each property at no cost.
Battery storage developers pay per megawatt of installed capacity. Here's what landowners near Minooka could earn:
| Project Size | Annual Lease | Land Needed | 25-Year Total |
|---|---|---|---|
| 2 MW | $16,000/yr | ~0.2 acres | $500,000 |
| 5 MW | $40,000/yr | ~0.5 acres | $1,250,000 |
| 10 MW | $80,000/yr | ~1 acres | $2,500,000 |
| 20 MW | $160,000/yr | ~2 acres | $5,000,000 |
Fill out a short form with your property location near Minooka. Takes about two minutes.
We evaluate your property's proximity to Minooka-area substations, available interconnection capacity, and grid infrastructure.
If your property qualifies, we present lease terms with annual payment amounts, duration, and escalation schedule.
Once signed, the developer handles permitting and construction. You start receiving lease payments.
If your property is within a few miles of a ComEd substation with available interconnection capacity in the Minooka area, it may qualify. Grundy County has 5 substations with up to 740 MW of capacity. Submit a free assessment to find out.
Battery storage needs only 0.2-2 acres — far less than solar. A typical 5 MW project uses about 0.5 acres. The rest of your property stays in production.
No. The installation is a small fenced area — typically the size of a few shipping containers on a concrete pad. Farmers report no impact on planting, harvesting, drainage, or equipment access.
None. The developer covers everything — permitting, construction, equipment, maintenance, and insurance. The assessment is also free with no obligation.
Find out if your property qualifies for a battery storage lease. Free assessment, no obligation.